Temporary Boiler Hire Cost
No UK boiler hire firm publishes a price list. Hire is charged per week, often with a one-week minimum, and delivery, connection and fuel come on top. Here is what each part covers, so you can read a quote properly.
The short version
You pay a weekly rate for the unit.
A one-week minimum is common.
Delivery, connection, collection and fuel are charged on top.
The size, hire length and site access decide most of the total.
Why you won't find a price list
You might expect boiler hire to work like tool hire, with a rate per week for each size. It doesn't. The national hirers ask you to call, and price by boiler size, hire duration and accessories. Smaller firms do the same.
That isn't secrecy for its own sake. Two sites hiring the same 250 kW unit can end up with very different bills: one has a yard next to the plant room and connection points already fitted, the other needs a crane, a road closure and forty metres of hose. The weekly rate is only part of it.
What a boiler hire quote is made of
Most quotes break down into the same handful of lines. Check each one is there, or that the quote says it is included.
| Charge | What it covers | What moves it |
|---|---|---|
| Weekly hire | The boiler itself, per week | Unit size, fuel type, hire length |
| Delivery and collection | Transport to and from site | Distance, vehicle, crane lifts, out-of-hours slots |
| Connection and commissioning | Hoses, fittings, engineers, first firing | Hose run, connection points, gas or electrical work |
| Fuel | Gas, oil or electricity burned | Load, weather, hire length |
| Extras | Bunded tank, extra hoses, standby unit, generator | What the site lacks |
| Servicing | Visits during longer hires | Hire length, running hours |
Off-hire is worth a look too. Draining down and disconnecting is sometimes priced inside delivery and collection, sometimes as its own line.
The weekly rate and the minimum
The weekly rate follows the size of the unit more than anything else, which is why sizing it right matters. A unit a size too big costs more every week of the hire. One a size too small leaves the building cold on the worst days. Our sizing calculator gives you a rough figure to check the firm's suggestion against.
A one-week minimum is common. Ask how part weeks are charged after that, because a two-and-a-half-week job can be billed as two and a half weeks or as three.
Fuel is often the biggest unknown
Fuel sits outside the hire rate, and on a long winter hire it can be the largest single cost. On gas and electric units you pay for what you use through the meter. On oil units you buy the fuel delivered to the unit's tank.
Oil also brings a storage rule. At business premises in England, a tank holding more than 200 litres needs a bund of at least 110% of its contents (GOV.UK). Hire tanks normally arrive bunded, but check the quote says so.
A worked example: comparing two quotes
Say a school asks two firms to cover a six-week boiler replacement over the summer. Quote A has a lower weekly rate. Quote B has a higher rate but includes connection, a bunded tank and one service visit.
To compare them fairly, add up six weeks of hire plus every one-off line in each, and leave fuel out of both (you pay for it either way). Then ask each firm the same two questions: what happens if the works run two weeks late, and is anything in the other quote missing from theirs? In a lot of cases the cheaper weekly rate stops being cheaper once delivery, connection and the overrun are in.
Public sector buyers
Councils, schools and NHS bodies often buy temporary boiler hire through a tender. Contract notices on Contracts Finder can show the value of past awards, which is a useful sense check before you set a budget.
Sources for this page
No official body publishes boiler hire rates, so this page carries no prices.
Questions about hire costs
Why won't hire firms give a price online?
Because the same unit can cost very different amounts to deliver and connect on two sites. Size, hire length, access, crane lifts and extras all change the total, so firms price once they know the job.
Is there a minimum hire period?
Often one week. Some firms charge part weeks pro rata after that; others round up to whole weeks. Ask which applies.
Is fuel included in the hire price?
Usually not. On gas and electric units you pay for what the meter records. On oil units you pay for the fuel delivered to the tank, and some firms arrange the deliveries for you.
Do longer hires work out cheaper per week?
The one-off charges for delivery, connection and collection are spread over more weeks, so the cost per week falls. Whether the weekly rate itself drops depends on the firm, so ask for the rate at the length you expect and at the length you might overrun to.
What makes connection more expensive?
Long hose runs, no existing connection points, awkward access, a crane lift, work outside normal hours, and anything that needs extra engineers on site.
Do I pay VAT on boiler hire?
Check whether each quote shows its figures with or without VAT before you compare two. Mixing the two is an easy mistake.
Keep reading
Get a written price for your site
We find a boiler hire firm that covers your site and give you their name before any of your details go to them. It costs you nothing.
What happens next
- We look for a hire firm that covers your postcode and the size of unit you need.
- We give you the firm's name first. Your details only go to them if you say yes.
- The firm checks the site, confirms the size and sends a written price.
Boiler Hire Company is an independent matching service, not a hire firm. If you hire through the firm we name, they pay us a fee; you pay us nothing.
Thanks. Your request is with us.
- We get back to you by email or phone, naming a hire firm that covers your site.
- Say yes and we send them your details. Say no and they never see them.
- The firm confirms the unit size and connection on a survey and puts its price in writing. We send no marketing.